Construction Work on Sanliurfa Ring Road, Direkli Dere Bridge, (K-1) Junction, (K-2) Junction, (K-4) Junction

• Construction of 3 bridges with a total length of 445 m and 1 viaduct with a length of 390 m
• Fabrication of 7.000 tons of ribbed steel
• Fabrication of 32.000 m3 of reinforced concrete
• Supplying and installing 780 tons of prestressed steel
• Fabrication and installation of 13.600 m3 prestressed beam
• Fabrication of 250.000 m3 of reinforced earth and 200.000 m of galvanized steel strip

PRINCIPAL
TCK-9. Regional Directorate of Highways
CONTRACT PRICE
21.852.009,00 $