Construction of Earth Levelling, Engineering Structures, Superstructure Works on (Nallihan - Mudurnu) Junction.- (Nallihan- Goynuk) Junction City Road, Between Km: Between 0 + 000 -15 + 391

• Excavation, transport, laying and compaction of 1.650.000 m3 of borrow cut excavation
• Non-stack backfilling with stones on 150.000 m3 mud sludge ground
• Construction of 25.000 m3 stone wall
• Construction of 380.000 tons of plantmix sub-soil and foundation
• Construction of culvert/headwall in different sizes, using 3.200 m3 of c30 / 37 reinforced concrete
• Supply and transport of 11.500 m3 of crushed asphalt stone

PRINCIPAL
TCK - 4. Regional Directorate
of Highways - ANKARA
CONTRACT PRICE
165.099.901,00 TL