ONGOING PROJECTS ◄
Earth Levelling, Construction of Engineering Structures, Superstructure Works on (Nallihan - Mudurnu) Junction.- (Nallihan- Goynuk) Junction City Road, Between Km: Between 0+000 -15+391
• Construction of 15 km road at terracing level
• Performing and transporting 1.425.000,00 m3 of cut excavation and roadside borrow excavation
• Fabrication of 1.150,00 m3 of concrete
• Fabrication of 193.000,00 tons pmt and sub-foundation
• Fabrication of various works








